Project:

 CNBM Cement, VRM updating project,2016

 By adopting VFD driving, FlSmidth, Atox 50 VRM reduced power consumption from 22 kwh to 18 kwh.

 By optimizing pipeline layout and air leakage, particle size of raw material is less than 12 % on R0.08 screen residue.
 Duration of project is 20 days

The vibration of VRM is less than 2 mm/s.